DM20: 20' single-pass drill
Designed for 20,000–34,000 lb excavators
Hydraulic driven with water/air swivel
100–130 RPM bit speed at maximum flow
4,000 lb pullback and pressure
2.375 API box output shaft
DM20 height: 23' 2"
DM20 weight: 3,200 lb
Pins onto trackhoe/excavator using existing pin holes in boom
DM25: 25' single-pass drill
Designed for 20,000–34,000 lb excavators
Hydraulic driven with water/air swivel
100–130 RPM bit speed at maximum flow
4,000 lb pullback and pressure
2.375 API box output shaft
DM25 height: 28' 2"
DM25 weight: 3,350 lb
Pins onto trackhoe/excavator using existing pin holes in boom
Larger excavators
20' to 25' wellpoint drilling
Construction dewatering projects
Groundwater control work
Contractors who need single-pass drilling capability
10' drill boom
Designed for 18,000–24,000 lb excavators
Hydraulic driven with water/air swivel
100–130 RPM bit speed at maximum flow
2.375 API box output shaft
Overall length: 12' 4"
Overall weight: 925 lb
Pins onto trackhoe/excavator using bucket pins
Medium excavators
Wellpoint installation
Construction dewatering crews
Drill boom applications
Contractors who need a practical hydraulic drill boom for dewatering jobs
Designed for smaller excavators
Designed for 11,000–18,000 lb excavators
Hydraulic driven with water/air swivel
90–110 RPM bit speed at maximum flow
NWJ output shaft
Mounts using excavator bucket pins
Smaller excavators
Lighter wellpoint drilling
Wellpoint installation on tighter jobsites
Construction dewatering crews using smaller machines
Contractors who need a hydraulic drill rig for dewatering work without oversizing the setup